Scrum for Team System Version 2.2 support for SQL Server 2008

As I have mention in a previous blog entry I’ve been heavily involved in the Scrum for Team System process template since the start of version 2 and have written the majority of the reports. I have faced, and still do, some challenges while doing this. Some of them have been around how to display the data within reporting services 2005.

Now with the release of Team Foundation Server 2008 Service Pack 1, release in August, this enables Team Foundation Server 2008 to be used on a SQL Server 2008 environment. This will make some of reporting challenges I faced with reporting services 2005 disappear. This will due to major changes that been made to reporting services 2008 like Tablix control and wider Dundas chart controls.

Within this release we have made a patch which will update some of the reports for reporting services 2008. This to fix some of the reporting services 2005 Patterns and Recipes which became visible. I am currently working looking at how Scrum for Team System can make more use of the reporting services 2008 which we will release as an advance reporting pack in the future.

To find out more about the Scrum for Team System SQL Server 2008 patcher please read the following Scrum for Team System blog

New Reporting Features available in Scrum for Team System v2.2

Build Reports added to Scrum for Team System v2.2

The Scrum for Team System report slide show tool

Scrum for Team System Version 2.2 support for SQL Server 2008

Comments

Popular posts from this blog

Azure SQL Server IaaS SSIS: A required privilege is not held by the client

SSIS File handle leak in For Each Loop

Cannot update a database that has been registered as a data-tier application